Scope of the simulation
Computer model of the system maps the sensors, actuators and material flow
Mapping of communication via TCP / IP telegrams
General conditions
Integration of real operating elements and HMIs
Connection of the computer model with the control technology
System tests in real time
Results
Reduction of on-site commissioning time
Test of emergency strategies
Training future users in operating the system
Ingo Rosteck
Head of Process Simulation
ingo.Rosteck(at)edag-ps.com
p +49 611737566960